Phase 1 Contaminated Land Desk Study

Have you been asked for a Phase 1 contaminated land desk study by your local authority? Or do you want a preliminary risk assessment of potential contaminated land on your site?

Fill out a quote form on this page, and a specialist from our team will be in touch with a free quote.

Get Your Free Quote
Reviews.io reviews Trustpilot reviews Google reviews
A geo-environmental team undertaking a phase 1 contaminated land desk study

Understanding Your Site’s Contamination Risk

Old factories, garages, petrol stations, farmyards and landfill can leave harmful substances in the soil, groundwater and ground gas long after a site has changed use.

You often can’t even see the effects of land contamination, and nothing on the surface could suggest that there’s a problem at all.

That said, if your site’s past could put future residents, workers, buildings or water at risk, your local council will want proof that the threats have been checked before you start any works.

Even if you are developing a single house, the local authority will want you to demonstrate the suitability of the development and the past uses of the site to remove any liability or risk to human health.

Without the proper checks, the contamination can delay your development, completely stop your work on the site or lead to an expensive clean-up later on in the process.

A Phase 1 contaminated land desk study is the first step. With it, you can get a clear understanding of your site’s risk early on, helping you to make informed decisions about your project, satisfy your local council, and only spend money on further work if it’s genuinely needed.

What is a Phase 1 Contaminated Land Desk Study?

Officially known as a preliminary risk assessment but also sometimes known as a geoenvironmental desk study, a Phase 1 contaminated land desk study is an initial assessment of whether or not your land could be contaminated.

It’s non-intrusive, with no digging or drilling, instead combining existing information about the development site with a walkover to check the current conditions of the land.

In simple terms, it builds a picture of the site’s environmental context and site conditions, highlighting any and all potential contamination risks.

Our Phase 1 desk studies also cover basic geotechnical factors, such as ground conditions that could affect your foundations, giving you a fuller picture from a single report.

When Would You Need a Phase 1 Contaminated Land Desk Study?

Contaminated land work follows a step-by-step approach set out in government guidance. A Phase 1 desk study is the first part of the phased approach, and in some cases, it’s the only step you’ll need.

In most cases, you’ll only need a Phase 1 desk study due to your planning application. Certain local councils will also ask for it as part of planning applications. For developers, the best advice would be to check your decision notice or speak to your local authority planning department if you’re unsure.

A Phase 1 contaminated land desk study may be required if:

  • Land nearby has a contaminative past, as neighbouring contaminated sites can still affect yours.
  • You’re changing to a more sensitive use, such as turning farming buildings, offices or industrial land into homes, gardens or a school.
  • Your site has a farming history, as old yards, sheds and fuel stores can all leave contamination behind.
  • Your site has a history of commercial or industrial use, including previous industrial works, garages, petrol stations, chemical storage, buried fuel tanks or landfill.

Away from planning, a Phase 1 desktop study can also be used by buyers as part of due diligence when it comes to purchasing land, and it’s common in property transactions. On the other side, lenders may also ask for one before approving funding.

Building control teams and building warranty providers may also ask about ground risks before they sign off on the build.

Every local planning authority has its own specific requirements, but national planning guidance expects developers to deal with land affected by contamination.

From the perspective of the local authorities, the step is vital, because a site’s historical use can affect development in ways that aren’t entirely obvious today.

Phase 1 Contaminated Land Process

Our consultants use a process that follows the Environment Agency’s Land Contamination Risk Management (LCRM) guidance:

Phase 1 Contaminated Land Assessment

The assessment stage involves desk research to gather background information and environmental data about the site, including:

  • Ground and water information, including geological maps, British Geological Survey (BGS) data and groundwater vulnerability ratings.
  • Mining records to check if a separate coal mining risk assessment is needed.
  • Planning records, previous reports and archive material wherever it’s available, such as records from the national archives.
  • Radon data from the UK Health Security Agency.
  • Regulatory records of permits, waste sites and pollution incidents, including flood risk and designated areas.
  • Site history from historical maps and other old maps that confirm historical land use.

Aerial imagery also helps to spot changes over time. Between aerial photographs and all other factors above, our team can identify potential environmental constraints and potential sources of contamination.

After the desk study, our land contamination consultants will carry out a site walkover survey. The site inspections look for anything that records can miss, such as stained ground, old tanks, dumped waste and hazardous substances, as well as the ground conditions and any potential hazards.

For lower-risk sites like houses and gardens, you can send us photos instead. With commercial or industrial sites, however, we recommend allowing our team to conduct a walkover.

All of the relevant information will be brought together, and we can carry out a qualitative assessment of the risks in line with the LCRM.

The initial investigations then decide whether the site needs any more work.

Phase 1 Contaminated Land Report

Once all of the survey work is complete, you will receive a preliminary risk assessment report, ready to be submitted to your local council.

A Phase 1 desk study report includes:

  • A conceptual site model showing where contamination could come from, how it could travel, and potential pollutant linkages of who or what it could reach.
  • A risk rating for each linkage, covering human health, buildings, water and the wider environment.
  • Basic geotechnical considerations to help your qualified engineers plan foundations.
  • Clear recommendations for any further action.
  • Ratings for radon, ground gas and unexploded ordnance (UXO), with advice if specialist testing is needed.

More than anything, the report gives you a clear verdict on contaminated land.

A Phase 1 contaminated land report tells you whether your site has any significant potential risks, which potential environmental risks need looking at, and whether any additional information is needed before your local council can make a decision.

Relevant Standards and Regulations

Every report follows current UK standards and environmental regulations:

  • BS 10175:2026 – the British Standard for investigating potentially contaminated sites.
  • LCRM – the Environment Agency (EA) guidance on managing land contamination.
  • The National Planning Policy Framework (NPPF) – the national policy on land affected by contamination.

Different environmental agencies cover each part of the UK. While England is covered by Natural England and the Environment Agency, Northern Ireland has the Northern Ireland Environment Agency (NIEA), Scotland has the Scottish Environment Protection Agency (SEPA), and Wales has Natural Resources Wales.

All of our environmental assessments are tailored to the guidance that corresponds to your site.

What Happens Next?

Depending on the outcome of the desk study, your report will recommend one of three routes:

  1. No More Work Needed: If no significant risks are found, you can usually ask your local council to sign off the contaminated land condition.
  2. Further Investigation: If a possible risk is found, you’ll need a Phase 2 site investigation – a form of intrusive ground investigation, usually involving soil sampling, water and ground gas testing. On small sites, a smaller exploratory investigation is enough to check one specific concern, which we can arrange through a partner from our network.
  3. Remediation: If contamination is confirmed, a remediation strategy sets out how to deal with it, such as removing or capping soil, or with the help of chemical treatment. A verification report then proves that the work was done properly.

All of our recommendations focus on mitigating risks in the most proportionate way, enabling you to only take further action when it’s genuinely needed.

An old petrol station on a now derelict contaminated site

Speak to the Contaminated Land Experts at Arbtech

With the right Phase 1 desk study, you’ll know exactly where you stand with the local council, what risks your site carries, and whether you need to do anything more.

Contaminated land doesn’t have to hold up your planning project, and it certainly doesn’t mean the end of your development plans.

Our in-house geo-environmental team carries out every Phase 1 desk study ourselves, meaning that you deal with the same people from start to finish.

Estimated Phase 1 Contaminated Land Assessment Cost

The cost of a Phase 1 desk study for contaminated land depends on how quickly you need your report and whether you’d like us to carry out a site walkover or send us photos instead.

Every option covers the desk research, the risk assessment and a report for your local council.

The price starts at £800+VAT, but with the cost being different with or without the walkover and options to upgrade for rapid or even next working day. Costs for the environmental data retrieved from the desktop study are included in the price.

For sites in Scotland and plots of land spanning over ten hectares in size, however, the total cost will differ.

Timescales include the desk study and the site walkover survey, starting once we have your planning details and photos.

As a Phase 2 site investigation can cost anywhere from £2000 to £20,000, arranging a Phase 1 desk study first and seeing if you actually need a more comprehensive assessment is money well spent.

Arranging the desktop study will mean that you know whether hazardous substances pose any risks to human health before you start building.

From there, you will avoid costly surprises and only pay for further work if your site conditions genuinely call for it.

Fill Out a Form for a Free Quote

It could be that you’ve just been given planning conditions, or maybe you’re still weighing up a development site that you’re considering buying.

Whatever the situation, contaminated land can feel daunting, especially if you aren’t sure about the past land use and worry that it could affect human health.

Fortunately for developers and prospective land purchasers, our in-house experts will take on the responsibility for it all and manage all stages of whatever surveys you need.

You can reach out for a free quote from our contaminated land team by filling out the quote form at the top of this page, calling us directly, emailing us or visiting our contact page.

All we ask is that you give us as much further information about your development site and planning project as you can, and we will plan a date to start supporting you.

Common Questions

Our standard service takes 2–4 weeks. But if you need it sooner, our rapid service takes 5–7 working days, or we can deliver your report by 5pm the next working day. Timings for all site assessments start once we have your planning details.
Don't worry, as we can keep it simple. Your Phase 1 report will explain what's needed and why. We can then arrange your Phase 2 through our trusted partners, so you don't need to find another consultancy.

Ready to Get Started?

Arbtech are your best asset when it comes to getting planning permission for your project. We cover the whole of the UK and we are waiting to get started on your project...

Get Your Free Quote

Are you sure you want to leave without a free quote?

Get a Quote

No thanks, I don't need a quote